Construction
Click on a thumbnail to see the full sized picture
Preliminary wing postioning
Fixing the metal chassis
Elevators attached.
Positioning and spacing wing sections.
The pilot joins up.
The plan.
Chassis
Covering begins.
The Rudder.
Lower wing compartment.
The power plant.
Warp actuator
Rigging.
Drive shaft assembley.
Home
Created with Easy Gallery Generator - EGG V2.1 - LATSOMEP